Power transformer substation
Power supply in local is the most important part for the steel making project.
We should apply 50MW from local power supply administration. After it is approved. We should consider to set up one transformer substation in a suitable place where connects power grid and our steel making plant. If local power supply grid is 110KV. We need one transformer to convert it into 35KV and 10KV. It will supply electrical power for ARC furnace, LF furnace, Continuous cast machine, Oxygen generator, Hang cranes, dust clean system, and all other equipment. Please check with the local power supply administration if it is possible to set up the transformer substation ourselves. In some countries, transformer substation must be set up by local power supply administration or any company which is nominated by them.